Product roadmap and multiple boards How the product roadmap tool in Projects zooms out past the current sprint, and how to run more than one board for different teams.

Part of NearSync AI: Project management software for UAE teams.

The sprint board is this round. Two other surfaces, the product roadmap and other boards, show the shape around it.

Roadmap

The Roadmap lays work across time, and zooms between year, quarter, month and week. Jump to now snaps back to today after you have been scrolling.

Work that is not yet scheduled sits in its own section rather than being mixed into the timeline, which keeps intention and commitment visibly separate. That separation is the useful part: a roadmap where everything looks equally committed is a roadmap nobody trusts.

More than one board

You are not limited to a single board. Boards can be created from templates for different kinds of work, each with its own fields and columns, and several can run side by side.

A screening board is the common second one: early requests land there and are reviewed before becoming real work, so the main board stays a record of what was actually committed to.

GitHub activity

Where code is connected, the sprint view shows development activity such as pull request throughput over recent weeks.

The value is in the disagreement. When the board says a sprint is nearly done and the code activity says otherwise, one of them is wrong, and it is worth knowing which before the review.

Reports

For anything spanning multiple sprints there are report types built on the same data: pivots, charts, funnels, correlation, anomaly detection, ranking and affinity.

Reach for these when the question is about patterns rather than this round. Within a single sprint, the board and the velocity trend answer most things faster.

3Updated 20 October 2026